Steel or Plywood Floor 27ft DNV 2.7-1 Standard Heavy Duty Offshore Container Lifting Frame Skid Baskets
Product Details:
Place of Origin: | Tianjin, China |
Brand Name: | ACE |
Certification: | DNV2.7-1 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1 pieces |
---|---|
Price: | $25,000.00/units 1-1 units |
Delivery Time: | within 30 days |
Detail Information |
|||
Type: | Dry Container | Length (feet): | 27ft |
---|---|---|---|
Capacity: | 68 CBM | External Dimensions(l X W X H)(mm): | 8320 X 3300 X 3546 Mm |
Internal Dimensions(l X W X H)(mm): | 7900 X 2900 X 3000 Mm | Name: | Frame |
Size: | 6058x2438x2896mm | Material: | Corten Steel |
Port: | Qingdao | Color: | Customized |
MOQ: | 1 Unit | Floor: | Steel Or Plywood Floor |
Application: | Oil Platform | Sling: | With Sling Set |
Product Description

Hot Sale Products
Product Spefications

DNV 2.7-1 Standard
27ft Offshore Container Lifting Frame Skid Baskets
●Material: Corten steel.
●Floor: Steel.
● Dimension: 8320x3300x3546mm.
● Meet requirement: DNV2.7-1 ISO18055
● Approved by: LR
● Color & Logo: As per your requirements.


Also provide 20ft GP and HC offshore frame




13ft Offshore Lifting Frame


Product Datasheet
Classification | Dimension(mm) | ||
External | Length | 8320 | |
Width | 3300 | ||
Height | 3456 | ||
Internal | Length | 7900 | |
Width | 2900 | ||
Height | 3000 | ||
Internal Cubic Capacity | 68 m³ | ||
Tare Weight | 7300 KGS | ||
Max Payload | 22700 KGS | ||
Lifting Angle | 45 degree |
We will provide full set of Offshore Container Documents:
1) DNV2.7-1 Certificate issued by BV or LR or DNVGL and Sling Certificate.(When there is sling)
2) General Arrangement Drawing
3) Manufacturing Records, like material certificate, WPS & PQR.
4) Inspection reports of NDT, Dimensions, Loading, Lifting, Painting.
Packing & Delivery
Package and Delivery | ||||||
Package | There is no package requirements about the dnv offshore container frame | |||||
Date of delivery | 1-5 pcs | Need around 30 days. | ||||
6-10 pcs | Need around 40 days. | |||||
11-20 pcs | Need around 50 days. |
About Tianjin ACE


Certification

Our Service

Send Us Inquiry

Want to Know more details about this product